A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Shibata, M.

Paper Title Page
THPP106 Neutrino Beam Line at J-PARC 3614
 
  • M. Shibata
    KEK, Tsukuba
 
  A neutrino beam line for the long baseline neutrino oscillation experiment T2K is under construction at J-PARC in Tokai. Construction is proceeding on schedule and commissioning of the beam line will start in April of 2009. Proton beams are injected from the main ring, then bent about 80 degrees using superconducting magnets directing the beam toward the Super-Kamiokande detector. Muon neutrinos are produced from pions produced at the target. Precise beam tuning is quite important in our beam line since the beam intensity is expected to be 750 kW and failure of the tuning system may cause damage to the beam line components. For this purpose, we install four types of beam monitors in the primary beam line:
  1. CT for beam intensity,
  2. ESM for beam position,
  3. SSEM for beam profile and
  4. a loss monitor.
Specifications and current status of these monitors will be reported. We report also on ground motion in the facility. Since the floor level of the neutrino beam line was observed to sink after initial construction, a level meter was installed to observe the motion continuously as it could be a serious problem for beam line alignment.