A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Shatunov, P. Yu.

Paper Title Page
TUOAG01 VEPP-2000 Electron-Positron Collider Commissioning and First Results of Round Colliding Beam Tests 956
 
  • Y. M. Shatunov, D. E. Berkaev, I. Koop, A. P. Lysenko, E. Perevedentsev, A. L. Romanov, P. Yu. Shatunov, D. B. Shwartz, A. N. Skrinsky
    BINP SB RAS, Novosibirsk
 
  VEPP-2000 electron-positron collider construction has been completed in the Budker INP at the beginning of 2007 year. First beam was captured in a special lattice without final focus solenoids. In this regime all systems of power supplies, machine control and beam diagnostics were calibrated and tuned. In the same mode vacuum chamber treatment by synchrotron radiation was performed with electron beam current up to 150 mA. The first test of the round beam option was performed at the energy of 508 MeV with the solenoidal field 10 T in two interaction straight sections. Studies of the beam-beam interaction have been done in "weak-strong" and "strong-strong" regimes. Measurements of beam sizes in the both cases have indicated a beam behavior similar to expectations for the round colliding beams.  
slides icon Slides  
THPC034 Correction the Round Beam Lattice of VEPP-2000 Collider Using Orbit Response Technique 3053
 
  • A. L. Romanov, D. E. Berkaev, A. N. Kirpotin, I. Koop, E. Perevedentsev, Yu. A. Rogovsky, P. Yu. Shatunov, D. B. Shwartz
    BINP SB RAS, Novosibirsk
 
  Round colliding beams option in VEPP-2000 puts a number of strict requirements on the collider lattice. Orbit Response Matrix (ORM) technique is a versatile tool for lattice analysis and correction. For linear optical function study and correction, the orbit response to the dipole correctors is collected and processed, while for the orbit correction the quadrupole trimming is used. Theoretical and experimental responses of closed orbit on the same perturbations are compared to determine the most probable deviations of chosen parameters from its project values.