A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Satou, K.

Paper Title Page
TUPC034 Beam Instrumentations for the J-PARC RCS Commissioning 1125
 
  • N. Hayashi, S. Hiroki, R. Saeki, K. Satou, R. Toyokawa, K. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • D. A. Arakawa, S. Hiramatsu, M. Tejima
    KEK, Ibaraki
  • S. Lee, T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
 
  A 3-GeV Rapid-Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) has been commissioned recently. During its beam commissioning, various beam diagnostic instrumentation has been used. The multi-wire profile monitor (MWPM) is used to establish injection and H0 dump line, which transports un-stripped H- or H0 beam to the dump. The electron catcher confirms that the beam hits a charge exchange carbon foil and the specified current monitor limits the beam current to the H0 dump. Single pass BPMs which detect linac frequency (324MHz) and ionization profile monitors (IPM) help to check the one pass orbit without circulation of the beam. The beam position monitor (BPM) can measure both COD and turn-by-turn position. Tune monitor system consists of exciter and its own BPM. The exciter shakes the beam and coherent oscillation is measured at BPM. Dedicated BPMs, Fast CT (FCT) and Wall Current Monitor (WCM) are used for RF feedback or feedforward control. It will describe the performance of each instruments and how they are contributed to the successful beam commissioning.  
TUPC035 The Beam Position Monitor System of the J-PARC RCS 1128
 
  • N. Hayashi, S. Hiroki, R. Saeki, K. Satou, R. Toyokawa, K. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • D. A. Arakawa, S. Hiramatsu, M. Tejima
    KEK, Ibaraki
  • S. Lee, T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
 
  The Beam Position Monitor (BPM) system of the J-PARC RCS has been fabricated, installed and operated successfully during the beam commissioning. There are 54 BPMs around the ring and most of them are placed inside steering magnets. The BPM is electro static type and it has four electrodes. A pair of electrode gives a linear response with diagonal cut shape and they were calibrated before their installation. The signal processing unit, which is equipped with 14-bit 14MSPS ADC and 600MHz DSP, has been developed for the system. In order to measure small signal, especially during the initial phase of the commissioning, careful design also done for cabling. The paper presents the current performance of the system.  
TUPC093 Beam Profile Monitor of the J-PARC 3GeV Rapid Cycling Synchrotron 1275
 
  • K. Satou, N. Hayashi, R. Saeki, A. Ueno, K. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • S. Lee, T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
  • M. Tejima
    KEK, Ibaraki
 
  To obtain high intensity (1MW) and large emittance (214 π mm mrad) beam profiles of the 3GeV Rapid Cycling Synchrotron (RCS) of the J-PARC, we have developed the ionization profile monitors (IPMs) with wide active aperture and high dynamic range. It has three Microchannel Plates (MCPs) with active area of 81*41mm for signal multiplication and read out devices, and magnet system to generate guiding fields to collect electrons. The wide active aperture of ±116mm is obtained by arranging the three MCPs perpendicular to the beam axis. Furthermore, the dynamic range of 104 level can be obtained by adjusting each bias voltage of the MCPs. The IPMs are now collecting ions without the guiding fields. The beam commissioning of the RCS has been in progress since last year. The horizontal and vertical profiles are of great help, particularly to check injection errors. At the conference, the present status of the IPM system and the latest beam profiles will be reported.