A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Romano, P.

Paper Title Page
THPP029 Status of the RAL Front End Test Stand 3437
 
  • A. P. Letchford, M. A. Clarke-Gayther, D. C. Faircloth, D. J.S. Findlay, S. R. Lawrie, P. Romano, P. Wise
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • S. M.H. Al Sari, S. Jolly, A. Kurup, D. A. Lee, P. Savage
    Imperial College of Science and Technology, Department of Physics, London
  • J. Alonso, R. Enparantza
    Fundación Tekniker, Elbr (Guipuzkoa)
  • J. J. Back
    University of Warwick, Coventry
  • F. J. Bermejo
    Bilbao, Faculty of Science and Technology, Bilbao
  • C. Gabor, D. C. Plostinar
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • J. Lucas
    Elytt Energy, Madrid
  • J. Pasternak, J. K. Pozimski
    STFC/RAL, Chilton, Didcot, Oxon
 
  High power proton accelerators (HPPAs) with beam powers in the several megawatt range have many applications including drivers for spallation neutron sources, neutrino factories, waste transmuters and tritium production facilities. The UK's commitment to the development of the next generation of HPPAs is demonstrated by a test stand being constructed in collaboration between RAL, Imperial College London, the University of Warwick and the Universidad del Pais Vasco, Bilbao. The aim of the RAL Front End Test Stand is to demonstrate that chopped low energy beams of high quality can be produced and is intended to allow generic experiments exploring a variety of operational conditions. This paper describes the current status of the RAL Front End Test Stand.