A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Pyka, N.

Paper Title Page
MOPC100 Design Status of the FAIR Synchrotrons SIS100 and SIS300 and the High Energy Beam Transport System 298
 
  • P. J. Spiller, U. B. Blell, O. Boine-Frankenheim, E. S. Fischer, G. Franchetti, F. Hagenbuck, I. Hofmann, J. E. Kaugerts, M. Kauschke, M. Kirk, H. Klingbeil, A. Kraemer, D. Krämer, G. Moritz, C. Omet, N. Pyka, H. Ramakers, S. Ratschow, A. Saa-Hernandez, M. Schwickert, J. Stadlmann, H. Welker
    GSI, Darmstadt
  • A. D. Kovalenko
    JINR, Dubna, Moscow Region
 
  The present status of system- and technical design and R&D for the new heavy ion synchrotrons SIS100 and SIS300 and the HEBT system is summarized. The overall machine planning and the general layout has been completed and the detailed technical machine design has been started. Device and component specifications, technical parameter lists and technical design reports are in preparation with the goal to enable international partners or industry to finalize the component design to achieve production readiness. In the frame of international working groups the distribution and sharing of the work packages, especially of the cryomagnetic system is under discussion.  
MOPC124 Ion Optical Design of SIS100 and SIS300 358
 
  • J. Stadlmann, G. Franchetti, B. J. Franczak, M. Kirk, N. Pyka, A. Saa-Hernandez, P. J. Spiller
    GSI, Darmstadt
 
  The ion optical layout of the two synchrotrons SIS100/300 of the FAIR project is presented. SIS100 will provide high intensity ion beams of all species from H to U up to a magnetic rigidity of 100 Tm. To minimize the space charge effects and to reach the necessary ion intensities for the FAIR project SIS100 will be operated with intermediate charge state heavy ions (U28+). The ion optical layout of SIS100 has been optimized for this purpose. The layout assures the separation of beam particles which are ionized by collisions with residual gas molecules from the circulating beam. Since SIS100 and SIS300 will be installed in the same tunnel, the lattice layout of SIS300 has to follow precisely the geometry of SIS100. SIS300 will provide beams of highly charged heavy ions with a maximum rigidity of 300 Tm. In addition, it will function as a stretcher ring for SIS100. The beam transfer system from SIS100 to SIS300 is designed to fit in a single straight section of the two machines. The effect of dynamic field errors in SIS300 has been considered and the maximum tolerable error levels for the operation of SIS100, such as tracking errors and power supply ripples have been investigated.  
THPP101 Investigation of Lifetime of the Electronics and the Fiber Optics inside the Niche and the Tunnel in the Slow Extraction Area of SIS100 3599
 
  • A. B. Plotnikov, E. Mustafin, N. Pyka, P. J. Spiller
    GSI, Darmstadt
 
  The loss of ions in the slow extraction area of the SIS100 accelerator project at FAIR can be dangerous for the electronic equipment and fiber optics situated inside the tunnel and niches around. During the slow extraction lost ions irradiate the yoke of the quadrupole magnets and collimator and produce a neutrons flux, which can damage or make single event upset at the electronic devices. Also fiber optic cores fade under the action of irradiation. In the current work the investigation of the dose distribution and neutron fluxes, as well as the calculation of the lifetime of the electronics and fiber optics in different places of the tunnel have been done. By using these results the design of the niches and shielding is planned.  
THPP102 Radiation Damage Studies for the Slow Extraction from SIS100 3602
 
  • A. Smolyakov
    ITEP, Moscow
  • E. Mustafin, N. Pyka, P. J. Spiller
    GSI, Darmstadt
 
  During the slow extraction from SIS100 synchrotron 5% of the beam will hit the wires of the electrostatic septum and will be lost. These losses produce very high radiation damage to the superconducting quadrupole doublet situated downstream of the extraction point. These beam losses were simulated with the help of Fluka code for U28+ and Ne5+ beams. Non-zero cross-section and non-zero angular divergence were assumed for the lost beam, allowing distributed modeling of the slow extraction losses. The radiation damage to different layers of the superconducting quadrupole cables was calculated. The lifetime of the s.c. cables of the quadrupoles was found to be too short. Thus, alternative quadrupole designs with higher radiation tolerances were investigated: with stainless steel shielding of the s.c. cables and with a gap in the mid-plane between the s.c. cables.  
THPP103 Design of the Beam Extraction System of the New Heavy Ion Synchrotrons SIS100 and SIS300 at FAIR 3605
 
  • N. Pyka, U. B. Blell, P. J. Spiller, J. Stadlmann
    GSI, Darmstadt
 
  The proton and heavy ion synchrotrons SIS100 and SIS300 are the heart of the new FAIR facility which is under construction on the site of the present GSI. All ions from protons to uranium will be accelerated up to a magnetic rigidity of 100 Tm and 300 Tm, respectively. The design of the beam extraction system of both synchrotrons is completed and will be presented in this paper. The extraction devices of both synchrotrons are situated in one common straight section and deflect the beam vertically. SIS100 has been optimized for fast extraction by means of a distributed fast bipolar kicker system. However, slow extraction over a few seconds is also foreseen. SIS300 has been optimized for slow extraction and may generate spills of up to 100s. The slow extraction channel combines horizontal deflection by an electrostatic septum in the first stage with vertical deflection by a Lambertson septum magnet and subsequent magnetic extraction septa in the second stage. An emergency beam dumping system could be integrated in the extraction system of both machines.