A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Okugi, T.

Paper Title Page
MOPP025 Design of the Beam Extraction by Using Strip-line Kicker at KEK-ATF 601
 
  • T. Naito, H. Hayano, K. Kubo, S. Kuroda, T. Okugi, N. Terunuma, J. Urakawa
    KEK, Ibaraki
 
  The developing work of the strip-line kicker system for International linear collider(ILC) is carrying out at KEK*. To confirm the performance of the kicker system, the beam extraction test by using strip-line kicker is in progress at KEK-ATF. The multi-bunch beam, which has 2.8ns bunch spacing in the damping ring, is extracted from the damping ring to the extraction line with 308ns duration. The scheme is the same as the kicker of the ILC. The bump orbit and the auxiliary septum magnet will be used with the kicker to clear the geometrical restriction. The detail of the hardware design and the basic performance of each component are presented in this paper.

*T. Naito et al. Development of the Strip-line Kicker System for ILC Damping Ring, Proceedings of PAC07, Albuquerque, New Mexico, USA, pp2772-2274.

 
THPC073 Measurement of Resonance Driving Terms in the ATF Damping Ring 3155
 
  • R. Tomas, F. Zimmermann
    CERN, Geneva
  • K. Kubo, S. Kuroda, T. Naito, T. Okugi, J. Urakawa
    KEK, Ibaraki
 
  The measurement of resonance driving terms in the Damping Ring of the Accelerator Test Facility in KEK could help finding possible machine imperfections and even to optimize single particle stability through the minimization of non-linearities. The first experimental attempts of this enterprise are reported in this note.