MOPD005 Recent Activities in ILC R&D at Hitachi 457
 
  • T. Semba, Y. Itou, S. Kajiura, Y. Tsujioka, T. Yoshinari
    Hitachi Ltd., Tokyo
  • M. Abe
    Hitachi, Ltd., Power & Industrial Systems R&D Laboratory, Ibaraki-ken
  • H. Hayano, Y. Higashi, S. Noguchi, N. Ohuchi, K. Saito, K. Tsuchiya
    KEK, Ibaraki
  • N. Torii
    Hitachi High-Technologies Corp., Ibaraki-ken
 
  We participated in the construction of STF (Superconducting RF Test Facility) cryomodule. This paper describes our recent activities in ILC R&D.  
MOPP131 Cryomodule Tests of the STF Baseline 9-cell Cavities at KEK 868
 
  • E. Kako, H. Hayano, S. Noguchi, N. Ohuchi, M. Sato, T. Shishido, K. Watanabe, Y. Yamamoto
    KEK, Ibaraki
 
  The STF-Baseline superconducting cavity system, which includes four TESLA-type 9-cell cavities, input couplers and frequency tuners, has been developed for the future ILC project. A 6m-cryomodule including one of four STF-Baseline cavities was assembled for the initial test called the STF Phase -0.5. The first cool-down of the cryomodule and high power tests of the STF-Baseline cavity had been successfully carried at 2 K. The maximum accelerating gradient (Eacc,max) of 19.3 MV/m was achieved in a specific pulse width of 1.5 msec and a repetition of 5 Hz, (23.4 MV/m in a shorter pulse of 0.6 msec). The onset of x-rays radiation was observed at higher field than 15 MV/m, and the measured Qo value was about 5 x 109 at 18 MV/m in accompanied with field emission. The detuning angle of about -13 degrees at 18 MV/m was successfully compensated to nearly zero by a combined operation with both an offset detuning and an optimised applied voltage in the piezo element. String assembly of four STF-Baseline cavities has been stated in Jan. 2008. The second cryomodule test for 4 cavities, called the STF Phase -1.0, is scheduled in this early summer.  
MOPP144 The First Cool-down Tests of the 6 Meter-Long-Cryomodules for Superconducting RF Test Facility (STF) at KEK 892
 
  • N. Ohuchi, F. Furuta, K. Hara, H. Hayano, N. Higashi, Y. Higashi, H. Hisamatsu, K. Hosoyama, E. Kako, Y. Kojima, M. Masuzawa, H. Matsumoto, H. Nakai, S. Noguchi, T. Saeki, K. Saito, T. Shishido, A. Terashima, N. Toge, K. Tsuchiya, K. Yokoya
    KEK, Ibaraki
  • M. H. Tsai
    NSRRC, Hsinchu
  • Q. J. Xu
    IHEP Beijing, Beijing
 
  KEK is presently constructing the Superconducting RF Test Facility (STF) as the center of the ILC-R&D in Asia from 2005. In this project, KEK aims to get the manufacturing and operational experiences of the RF cavity and cryomodule toward the ILC, and two cryomodules have been developed. These cryomodules are 6 meter long and have 4 nine-cell cavities in each cryostat. The basic cross section designs of the cryomodules are almost same as the design of TESLA type-III, however, each cryostat has the different type of cavities, TESLA type and Low-Loss type. The tests for the cryomodules are planed to be performed at three steps. In the first test, measurements of the cryogenic performances of these cryomodules are the main objective. One nine-cell cavity was assembled in each cryostat and the cool-down of the two cryomodules was performed. In the following tests, the four nine-cell cavities will be assembled in each cryostat as the complete integration and the beam test will be performed. In this paper, we will report the design of the cryomodules and the cryogenic performances at the first cold test.  
MOPP029 The First Measurement of Low-loss 9-cell Cavity in a Cryomodule at STF 610
 
  • T. Saeki, M. Akemoto, S. Fukuda, F. Furuta, K. Hara, Y. Higashi, T. Higo, K. Hosoyama, H. Inoue, A. Kabe, H. Katagiri, S. Kazakov, Y. Kojima, H. Matsumoto, T. Matsumoto, S. Michizono, T. Miura, Y. Morozumi, H. Nakai, K. Nakanishi, N. Ohuchi, K. Saito, M. Satoh, T. Takenaka, K. Tsuchiya, H. Yamaoka, Y. Yano
    KEK, Ibaraki
  • T. Kanekiyo
    Hitachi Technologies and Services Co., Ltd., Kandatsu, Tsuchiura
  • J. Y. Zhai
    IHEP Beijing, Beijing
 
  We are constructing Superconducting RF Test Facility (STF) at KEK for the R&D of International Linear Collider (ILC) accelerator. In the beginning of year 2008, we installed one high-gradient Low-Loss (LL) type 9-cell cavity into a cryomodule at STF, where we assembled an input coupler and peripherals with the cavity in a clean room, and the assembled cavity packages were dressed with thermal shields and installed into a cryomodule. At the room-temperature, we performed the processing of capacitive-coupling input-coupler upto the RF power of 250 kW. At the temperature of 4 K, we measured the loaded Q of the cavity and the tuner was tested. At the temperature of 2 K, high-power RF was supplied from a klystron to the cavity and the performance of the cavity packeage was tested. This article presents the results of the first test of the Low-Loss (LL) 9-cell cavity package at 2 K in a cryomodule.