A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Moon, S.-I.

Paper Title Page
MOPP044 Cavity Diagnostic System for the Vertical Test of the STF Baseline 9-cell Cavity at KEK 643
 
  • Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido, K. Umemori, K. Watanabe
    KEK, Ibaraki
  • S.-I. Moon
    POSTECH, Pohang, Kyungbuk
  • H. Sakai, K. Shinoe
    ISSP/SRL, Chiba
  • Q. J. Xu
    IHEP Beijing, Beijing
 
  Four 9-cell cavities, which are TESLA-type 9-cell cavities, were developed and tested in KEK for the future ILC project. A simple cavity diagnostic system was introduced to search the heating spot and to detect the x-ray emission. It is composed of the carbon resistors and the PIN photo diodes. They were attached on the equator of the cell, around the HOM couplers and on the end flanges. They were very effective to search the heating spot and to detect the x-ray emission during the vertical tests. All cavities eventually had the heating spot around the equator in the final state of the vertical test. It is conceivable that the quality of the electron beam welding was somewhat poor, when the dumbbells were connected. On this February, a new vertical test facility will be completed in STF (Superconducting RF Test Facility). Six 9-cell cavities will be tested by using the new system for S0 plan, which goal is the higher accelerating gradient for ILC. The new temperature and x-ray mapping system and new DAQ system will be introduced. This paper reports the recent status in the new vertical test facility in KEK-STF.