A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Ma, L.

Paper Title Page
TUOAG02 Commissioning of BEPCII 959
 
  • J. Q. Wang, L. Ma, C. Zhang
    IHEP Beijing, Beijing
 
  BEPCII is the upgrade project of Beijing Electron Positron Collider (BEPC), serving continuously for both high energy physics experiment and light soure use. As an e+-e- collider, BEPCII will operate in the beam energy region of 1-2.1 GeV with design luminosity of 1*1033cm-2s-1 at 1.89 GeV. The beam commissioning of BEPCII storage rings started out in Nov. 2006. From Nov. 2006 to Aug. 2007, the phase one commissioning was carried out successfully with the so called backup scheme adopting conventional magnets in the IR intead of the superconducting insertion magnets (SIM). After the SIM was intalled into the interaction region, phase two commissioning began in Oct. 2007. The tuning method for high luminosity but low background was extensively studied during phase two, and the beam current has reached more than 1/3 of the design of 0.91 A. The third phase of beam commissioning is planned in May this year after the detector is moved into the on-line position. It is expected that the luminosity would reach to about 30% of its design specification. This paper describes the procedure of beam commissioning of BEPCII and focuses on results of its second phase.  
slides icon Slides  
TUPC099 Wire Scanner for Transverse Beam Parameter Measurements in BEPCII 1293
 
  • Y. F. Sui, J. Cao, L. Ma
    IHEP Beijing, Beijing
 
  The wire scanner has been installed in the linac injector of BEPCII (Beijing Electron-Positron Collider II) to provide the transverse beam parameters. In the several fellowing months, some experiments will be done. The result will be presented and the reason will be analysed.