Lipka, D.

Paper Title Page
TUPC045 Setup and Commissioning of the Diagnostics Beamline for the SRF Photoinjector Project at Rossendorf 1158
 
  • T. Kamps, D. Böhlick, M. Dirsat, T. Quast, J. Rudolph, M. Schenk
    BESSY GmbH, Berlin
  • A. Arnold, F. Staufenbiel, J. Teichert
    FZD, Dresden
  • G. Klemz, I. Will
    MBI, Berlin
  • D. Lipka
    DESY, Hamburg
 
  A superconducting radio frequency photo electron injector (SRF injector) has been developed by a collaboration of BESSY, DESY, FZD and MBI and is in operation since late 2007. After the initial commissioning in late 2007 with a Copper photocathode a Caesium-Telluride cathode was installed early 2008 to allow for high charge production. The longitudinal and transverse electron beam parameters are measured in a compact diagnostics beamline. This paper describes results from beam commissioning of the main diagnostic tools. Special emphasis is given on the bunch length measurement system for the 15 ps FWHM electron bunches. The system is based on the conversion of the electron pulses into radiation pulses by Cherenkov radiation. These radiation pulses are transported in a novel fully-reflective, relay imaging optical beamline to a streak camera, where the temporal properties of the pulses are measured. Results from beam measurements at 2pC (Copper cathode) and 1nC (Cesium-Telluride cathode) bunch charge are presented and discussed.  
TUPC111 Overview of the Diagnostics Systems of PETRA III 1323
 
  • G. Kube, K. Balewski, A. Brenger, H. T. Duhme, V. Gharibyan, J. Klute, K. Knaack, I. Krouptchenkov, T. Lensch, J. Liebing, D. Lipka, R. Neumann, R. Neumann, G. Priebe, F. Schmidt-Foehre, H.-Ch. Schroeder, R. Susen, S. Vicins, M. Werner, Ch. Wiebers, K. Wittenburg
    DESY, Hamburg
 
  Since mid-2007, the existing storage ring PETRA at DESY is reconstructed towards a dedicated third generation hard x-ray light source operating at 6 GeV with 100 mA stored current. The reconstruction includes the total rebuilding of one-eights of the storage ring. In this part the FODO lattice of the arcs is replaced by double-bend achromat cells, resulting in straight sections for 14 insertion device beamlines. Damping wigglers with a total length of 80 m are installed to reduce the emittance down to the design value of 1 nm rad. In order to fully benefit from this low emittance, beam stability is a crucial issue. For the achievement of the required performance and to allow a safe machine operation a number of beam instrumentation is required. Here the diagnostics system for the electron beam is presented with special emphasis on the essential instruments, i.e. the high resolution BPM system, profile monitors, feedback systems, and the machine protection system.  
WEPC037 Preparations of BESSY for Top Up Operation 2067
 
  • P. Kuske, M. Abo-Bakr, W. Anders, T. Birke, K. B. Buerkmann-Gehrlein, M. Dirsat, O. Dressler, V. Duerr, F. Falkenstern, W. Gericke, R. Goergen, F. Hoffmann, T. Kamps, J. Kuszynski, I. Mueller, R. Mueller, K. Ott, J. Rahn, T. Schneegans, D. Schueler, T. Westphal, G. Wuestefeld
    BESSY GmbH, Berlin
  • D. Lipka
    DESY, Hamburg
 
  The synchrotron light source BESSY went into operation for users in 1998. BESSY was not designed initially to allow for Top Up operation, a mode where lost electrons are replaced after minutes while the beam shutters are open and users take data. Since 3 years the facility is improved in order to guarantee safe operation in this risky mode. The work culminated in a one week long Top Up test run at the beginning of this year. The efforts and achievements are described in detail: Improvements of the injector, the pulsed injection elements, the timing system, insertion devices, the additional safety interlocks, and the shielding of the ring.