WEPC043 Commissioning of 360 mA Top-up Operation at TLS 2082
 
  • Y.-C. Liu, H.-P. Chang, K.-K. Lin, Y. K. Lin, G.-H. Luo
    NSRRC, Hsinchu
 
  Taiwan light source started the 200 mA top-up operation in October, 2005, and subsequently, the stored top-up beam current was raised to 300 mA. Several machine issues were observed and solved during past two years. We study the possibility and ability of 360 mA top-up operation at Taiwan light source.