Paper | Title | Page |
---|---|---|
MOPP109 | Status of the 100 MeV Preinjector for the ALBA Synchrotron | 811 |
|
||
A turn key 100 MeV linac has been constructed by THALES in order to inject electrons into the booster synchrotron of ALBA*. The linac will be commissioned in May 2008. This paper will remind the main features of the linac** and will give results obtained during the commissioning tests. The energy and emittance measurements will be done on the transfer line conceived and realized by CELLS.
* D. Einfeld "Status of ALBA", PAC07, Albuquerque, USA, June 2007. |