A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Geschonke, G.

Paper Title Page
WEPP139 The CTF3 Two-beam Test-stand Installation and Experimental Program 2821
 
  • V. G. Ziemann, T. J.C. Ekelöf, M. Johnson, R. J.M. Y. Ruber
    UU/ISV, Uppsala
  • H.-H. Braun, S. Doebert, G. Geschonke, G. Riddone, J. P.H. Sladen, I. Syratchev, W. Wuensch
    CERN, Geneva
 
  The Two-beam Test-stand in CTF3 will be used to investigate the power-generation and accelerating structures for the Compact Linear Collider CLIC. We report on its design and construction which was recently completed and discuss the imminent commissioning phase as well as the following experimental program that initially will be devoted to the test of power generation structures in the drive-beam.  
THYG02 Results from the CLIC Test Facility CTF3 and Update on the CLIC Design 2912
 
  • G. Geschonke
    CERN, Geneva
 
  The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented.  
slides icon Slides