A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Galambos, J.

Paper Title Page
MOPC136 Beam Bunch Leakage and Control in the SNS Ring 391
 
  • Y. Zhang, J. Galambos
    ORNL, Oak Ridge, Tennessee
 
  In recent neutron production operations at SNS, beams contaminated the longitudinal extraction gap of the accumulator ring due to the limitation of the beam choppers. It caused significant beam loss and activation in the ring and in the extraction beam line. From simulations with computer models and in experimental measurements, properly utilizing the ring RF systems with additional storage turns after the beam accumulations in the ring effectively reduced beam loss in the SNS accelerator systems. Simulations and beam measurement results will be discussed  
MOPD032 Neutronics Calculations to Support the SNS Accelerator Facility 520
 
  • I. I. Popova, G. W. Dodson, P. D. Ferguson, J. Galambos, F. X. Gallmeier
    ORNL, Oak Ridge, Tennessee
 
  The Spallation Neutron Source (SNS) is an accelerator driven neutron scattering facility for materials research that recently started operations. After commissioning, the facility started at low power and is presently in the process of a power ramp to reach the Megawatt power level within two years of operations, maintenance, and tuning cycles. Extensive neutronics work for shielding development and dose rate predictions was completed during design and construction for various operational and shut down scenarios. Now that the facility is successfully operating, there is still demand for neutronics analyses for radiation-protection support. This need arises from redesigning some parts of the facility, facility upgrades, designing additional structures, designing test stands for accelerator structures, and verification and code validation analyses on the basis of the measured data.  
THPP044 Experience with the SNS SC Linac 3461
 
  • Y. Zhang, A. V. Aleksandrov, C. K. Allen, I. E. Campisi, S. M. Cousineau, V. V. Danilov, J. Galambos, J. A. Holmes, D.-O. Jeon, S.-H. Kim, T. A. Pelaia, A. P. Shishlo
    ORNL, Oak Ridge, Tennessee
 
  The SNS SC linac (SCL) is designed to deliver 1 GeV, up to 1.56 MW pulsed H- beams for neutron production. Beam commissioning of the SNS accelerator systems completed in June 2006 with the maximum linac output beam energy approximately 952 MeV. In 2007, we successfully tuned the SCL for 1 GeV beams during a test run, and the SNS linac achieved its design energy for the first time. During the linac tune-up, phase scan signature matching, drifting beam measurement as well as linac RF cavity phase scaling was applied. In this paper, we will introduce the experiences with the SCL, and we will also briefly discuss beam parameter measurements.


 
THPP073 Performance of the SNS Front End and Warm Linac 3530
 
  • A. V. Aleksandrov, C. K. Allen, S. M. Cousineau, V. V. Danilov, J. Galambos, J. A. Holmes, D.-O. Jeon, T. A. Pelaia, M. A. Plum, A. P. Shishlo, M. P. Stockli, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  The Spallation Neutron Source accelerator systems will deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. The 2.5 MeV beam from the Front End is accelerated to 86 MeV in the Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and finally to 1 GeV in the Superconducting Linac. With the completion of beam commissioning, the accelerator complex began operation in June 2006 and beam power is being gradually ramped up toward the design goal. Operational experience with the injector and linac will be presented including chopper performance, longitudinal beam dynamics study, and the results of a beam loss study.  
THPP085 Status of the SNS Ring Power Ramp Up 3560
 
  • M. A. Plum, A. V. Aleksandrov, C. K. Allen, S. M. Cousineau, V. V. Danilov, J. Galambos, J. A. Holmes, D.-O. Jeon, T. A. Pelaia, A. P. Shishlo, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Beam was first circulated in the SNS ring in January 2006. Since that time we have been working to raise the beam power to the design value of 1.4 MW. In general the power ramp up has been proceeding very well, but several issues have been uncovered. Examples include poor transmission of the waste beams in the injection dump beam line, cross-plane coupling in the ring to target beam transport line, and higher-than-expected peak densities in the ring to target transport. In this paper we will discuss these issues and present an overall status of the ring and the transport beam lines.