A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Gaio, G.

Paper Title Page
TUPP009 Implementation and Operation of the Elettra Booster Control System 1544
 
  • M. Lonza, F. Asnicar, L. Battistello, S. Fontanini, V. Forchi', G. Gaio, F. Giacuzzo, E. Mariotti, R. Marizza, R. Passuello, L. Pivetta, C. Scafuri, G. Scalamera, G. Strangolino, D. Vittor, L. Zambon
    ELETTRA, Basovizza, Trieste
 
  A new injector based on a 100 MeV linac and a 2.5 GeV booster synchrotron has been built and commissioned at Elettra to provide full energy and top up injection into the storage ring. The booster replaces the 1.2 GeV linac that will be used for the new 4th generation light source FERMI@Elettra currently under construction at Elettra. A new architecture has been adopted for the booster control system based on the Tango control system software. The implementation of the control system and the tools developed to meet an aggressive commissioning time schedule are presented. The experience gained during the operation of the booster is also discussed.  
THPC153 Timing System of the New Elettra Injector 3351
 
  • S. Bassanese, A. Carniel, R. De Monte, M. Ferianis, G. Gaio
    ELETTRA, Basovizza, Trieste
 
  A new timing system has been developed to operate the new injector for the Elettra storage ring. It implements a versatile injection system to support standard and exotic fillings as well as the top-up mode of operation. Based on an in-house developed programmable counter VME board, the system provides all the needed triggers by the pre-injector LINAC, the booster injection, the booster ramping system, the booster extraction, and the SR injection. An overview of the system architecture and functionality is described and the performance of the board is reported. All the trigger signals are distributed to the timing clients by means of optical links.