TUPP005 Application Programs for the Elettra Booster Commissioning and Operation 1535
 
  • F. Iazzourene, V. Forchi', C. Scafuri
    ELETTRA, Basovizza, Trieste
 
  The application programs developed for the commissioning and operation of the new Elettra injector* are all based on the TANGO control system, a new high level framework and a beam optics module named Vicky**. The present paper summarizes the main developed application programs and their successful use during commissioning and operation of the new injector.

*"Overview of the Status of the Elettra Booster Project," these proceedings.
**"Elettra New Full Injector High Level Software," C. Scafuri, F. Iazzourene, EPAC 2006.

 
TUPP009 Implementation and Operation of the Elettra Booster Control System 1544
 
  • M. Lonza, F. Asnicar, L. Battistello, S. Fontanini, V. Forchi', G. Gaio, F. Giacuzzo, E. Mariotti, R. Marizza, R. Passuello, L. Pivetta, C. Scafuri, G. Scalamera, G. Strangolino, D. Vittor, L. Zambon
    ELETTRA, Basovizza, Trieste
 
  A new injector based on a 100 MeV linac and a 2.5 GeV booster synchrotron has been built and commissioned at Elettra to provide full energy and top up injection into the storage ring. The booster replaces the 1.2 GeV linac that will be used for the new 4th generation light source FERMI@Elettra currently under construction at Elettra. A new architecture has been adopted for the booster control system based on the Tango control system software. The implementation of the control system and the tools developed to meet an aggressive commissioning time schedule are presented. The experience gained during the operation of the booster is also discussed.