Fernandez-Robles, C.

Paper Title Page
MOPC118 Coordination of the Commissioning of the LHC Technical Systems 340
 
  • R. I. Saban, B. Bellesia, M. P. Casas Lino, C. Fernandez-Robles, M. Pojer, R. Schmidt, M. Solfaroli Camillocci, A. Vergara-Fernández
    CERN, Geneva
 
  The Large Hadron Collider operation relies on 1232 superconducting dipoles with a field of 8.33T and 400 superconducting quadrupoles with a strength of 220 T/m powered at 12kA, operating in superfluid He at 1.9K. For dipoles and quadrupoles as well as for many other magnets more than 1700 power converters are necessary to feed the superconducting circuits. A sophisticated magnet protection system is crucial to detect a quench and safely extract the energy stored in the circuits (about 1GJ only in one of the dipole circuits) after a resistive transition. Besides, in such complex architecture, many technical services (e.g. cooling and ventilation, technical network, electrical distribution, GSM network, controls system, etc.) have to be reliably available during commissioning. Consequently, the commissioning of the technical systems and the associated infrastructures has been carefully studied. Procedures, automatic control and analysis tools, repositories for test data, management structures for carrying out and following up the tests have been put in place. This paper briefly describes the management structure and the tools created to ensure safe, smooth and rapid commissioning.  
WEPP010 Scheduling the Powering Tests 2545
 
  • K. Foraz, E. Barbero-Soto, B. Bellesia, M. P. Casas Lino, C. Fernandez-Robles, M. Pojer, R. I. Saban, R. Schmidt, M. Solfaroli Camillocci, A. Vergara-Fernández
    CERN, Geneva
 
  The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems (“hardware commissioning”). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.