WEPC037 Preparations of BESSY for Top Up Operation 2067
 
  • P. Kuske, M. Abo-Bakr, W. Anders, T. Birke, K. B. Buerkmann-Gehrlein, M. Dirsat, O. Dressler, V. Duerr, F. Falkenstern, W. Gericke, R. Goergen, F. Hoffmann, T. Kamps, J. Kuszynski, I. Mueller, R. Mueller, K. Ott, J. Rahn, T. Schneegans, D. Schueler, T. Westphal, G. Wuestefeld
    BESSY GmbH, Berlin
  • D. Lipka
    DESY, Hamburg
 
  The synchrotron light source BESSY went into operation for users in 1998. BESSY was not designed initially to allow for Top Up operation, a mode where lost electrons are replaced after minutes while the beam shutters are open and users take data. Since 3 years the facility is improved in order to guarantee safe operation in this risky mode. The work culminated in a one week long Top Up test run at the beginning of this year. The efforts and achievements are described in detail: Improvements of the injector, the pulsed injection elements, the timing system, insertion devices, the additional safety interlocks, and the shielding of the ring.