TUPC125 Status of the Spallation Neutron Source Superconducting RF Facility 1362
 
  • F. Casagrande, S. Assadi, M. T. Crofford, W. R. DeVan, X. Geng, T. W. Hardek, S. Henderson, M. P. Howell, Y. W. Kang, J. Mammosser, W. C. Stone, D. Stout, W. H. Strong, D. C. Williams, P. A. Wright
    ORNL, Oak Ridge, Tennessee
 
  The Spallation Neutron Source (SNS) project was completed without on-site superconducting RF (SRF) facilities. Installation of the infrastructure necessary to maintain and repair the superconducting Linac and to support power upgrade research and development (R&D) is well underway. Installation of a Class10/100/10,000 cleanroom and outfitting of the test cave with RF, vacuum, controls, personnel protection and cryogenics systems is now complete. These systems were recently operated satisfactorily to test a cryomodule that had been removed from the accelerator and repaired in the cleanroom. A horizontal cryostat has been fabricated and will be soon commissioned. Equipment for cryomodule assembly and disassembly has been installed and used for cryomodule disassembly. Cavity processing equipment, specifically an ultra-pure water system, high pressure rinse system, and vertical test area is being designed and installed. This effort is providing both high-power test capability as well as long-term maintenance capabilities. This paper presents the current status and the future plans for the SNS SRF test facility.