MOPP124 Commissioning of the 400 MHz LHC RF System 847
 
  • E. Ciapala, L. Arnaudon, P. Baudrenghien, O. Brunner, A. Butterworth, T. P.R. Linnecar, P. Maesen, J. C. Molendijk, E. Montesinos, D. Valuch, F. Weierud
    CERN, Geneva
 
  The installation of the 400 MHz superconducting RF system in LHC is finished and commissioning is under way. The final RF system comprises four cryomodules each with four cavities in the LHC tunnel. Also underground in an adjacent cavern shielded from the main tunnel are the sixteen 300 kW klystron RF power sources with their high voltage bunkers, two Faraday cages containing RF feedback and beam control electronics, and racks containing all the slow controls. The system and the experience gained during commissioning will be described. In particular, results from conditioning the cavities and their movable main power couplers and the setting up of the low level RF feedbacks will be presented.