A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Barnes, M. J.

Paper Title Page
TUPD002 Development of an Eddy Current Septum for LINAC4 1434
 
  • M. J. Barnes, B. Balhan, J. Borburgh, T. Fowler, B. Goddard, W. J.M. Weterings
    CERN, Geneva
  • A. Ueda
    KEK, Ibaraki
 
  The bump for the new PS Booster injection from the future Linac4 will be made up of a set of four pulsed dipole magnets; the first of these (BS1) must act as a septum with a thin element dividing the high-field region of the circulating beam from the field-free region through which the injected H- beam must pass. BS1 will provide a deflection of 66 mrad at 160 MeV; this will be achieved with a peak field of 630 mT and a length of 200 mm. The field must rise and fall in 40 microseconds and have a flattop of up to 120 microseconds. The ripple of the flattop should be below ±1%. This paper discusses the design of an eddy current septum for BS1.  
TUPD003 Upgrading the Fast Extraction Kicker System in SPS LSS6 1437
 
  • M. J. Barnes, L. Ducimetière, B. Goddard, J. A. Uythoven
    CERN, Geneva
 
  A fast extraction system, located in the LSS6 region of the CERN SPS accelerator, transfers 450 GeV/c protons, as well as ions, via the transfer line TI 2 towards the LHC. The system includes three travelling wave kicker magnets, all powered in series, energised by a single Pulse Forming Network (PFN) and terminated by a short circuit. The specification for the system requires a kick flattop of 7800 ns duration with a ripple of not more than ±0.5%. Recent measurements with beam show that the ±0.5% kick specification is achieved over the initial 7100 ns of the kick flattop; however the ripple over 7800 ns is ±0.7%. Electrical measurements have been carried out on each of the three magnets: these have been compared with the beam measurements and the contribution of each magnet to the detailed shape of the flattop kick has been determined. This paper reports the results of measurements and describes the plans to upgrade the system to fully meet the kick specification.  
THPP113 Emittance Growth at LHC Injection from SPS and LHC Kicker Ripple 3629
 
  • B. Goddard, M. J. Barnes, L. Ducimetière, W. Höfle, G. Kotzian
    CERN, Geneva
 
  Fast pulsed kicker magnets are used to extract beams from the SPS and inject them into the LHC. The kickers exhibit time-varying structure in the pulse shape which translates into small offsets with respect to the closed orbit at LHC injection. The LHC damper systems will be used to damp out the resulting betatron oscillations, to keep the growth in the transverse emittance within specification. This paper describes the results of the measurements of the kicker ripple for the two systems, both in the laboratory and with beam, and presents the simulated performance of the transverse damper in terms of beam emittance growth. The implications for LHC operation are discussed.