WEPC055 General Status of SESAME 2115
 
  • H. Tarawneh, T. H. Abu-Hanieh, A. Al-Adwan, M. A. Al-najdawi, A. Amro, M. Attal, D. S. Foudeh, A. Kaftoosian, T. A. Khan, F. Makahleh, S. A. Matalgah, A. M. Mosa Hamad, M. M. Shehab, S. Varnasseri
    SESAME, Amman
  • A. Nadji
    SOLEIL, Gif-sur-Yvette
 
  An update of the status of SESAME is presented. SESAME is a third generation light source facility under construction in Allan, Jordan. The storage ring electron beam energy is 2.5 GeV, the beam emittance is 26 nm.rad and 12 straight sections are available for Insertion Devices. The injector consists of a 22.5 MeV microtron and 800 MeV booster synchrotron, with a repetition rate of 1 Hz. The SESAME building has been handed over on Dec. 2007 and this note focuses on the upgrade and installation plans for the SESAME injector system during the 2008. In the meantime, preparations of technical specifications for most of the storage ring subsystems are in progress. In this note the conceptual design of the storage ring’s bending magnet, pulsed magnets and their power supplies, RF system, shielding wall and the cooling system are presented. The tendering of these components is expected by mid 2008.