A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Zobov, M.

 
Paper Title Page
MOPLS029 Preliminary Study of a Crab Crossing System for DAFNE 607
 
  • A. Gallo, D. Alesini, F. Marcellini, P. Raimondi, M. Zobov
    INFN/LNF, Frascati (Roma)
 
  The implementation of a crab crossing scheme at the Frascati Phi-factory DAFNE is under consideration, together with several other ideas and upgrades to increase the collider luminosity. The crab crossing is beneficial to the luminosity because it is expected to optimize the geometrical superposition of the colliding bunches and to weaken the synchro-betatron beam-beam resonances. The basic specifications of such a system, the expected luminosity increase, a preliminary design of the crab cavities and the architecture of the dedicated RF system are presented.  
TUODFI02 DAFNE Experience with Negative Momentum Compaction 989
 
  • M. Zobov, D. Alesini, M.E. Biagini, A. Drago, A. Gallo, C. Milardi, P. Raimondi, B. Spataro, A. Stella
    INFN/LNF, Frascati (Roma)
 
  There are several potential advantages for a collider operation with a lattice having a negative momentum compaction factor (alfa): bunches can be shorter and have a more regular shape; longitudinal beam-beam effects and synchrobetatron resonances are predicted to be less dangerous; requirements on sextupole strengths can be relaxed because there is no head-tail instability with the negative chromaticity. Since the lattice of the Frascati e+e- Phi-factory DAFNE is flexible enough to provide collider operation with alfa < 0, we have exploited this possibility to study experimentally the beam dynamics. The negative momentum compaction lattices have been successfully implemented and stable 1 A currents have been stored in both the electron and positron rings without any problem for RF cavities and feedback systems operation. First collisions have been tested at low currents. In this paper we describe the experimental results and compare them with expectations and numerical simulations. Present limitations to DAFNE operation with alfa < 0 are also discussed.  
slides icon Transparencies
THPCH011 Wire Compensation of Parasitic Crossings in DAFNE 2808
 
  • M. Zobov, D. Alesini, C. Milardi, M.A. Preger, P. Raimondi
    INFN/LNF, Frascati (Roma)
  • D.N. Shatilov
    BINP SB RAS, Novosibirsk
 
  Long-range beam-beam interactions (parasitic crossings) are one of the main luminosity performance limitations for the Frascati e+e- Phi-factory DAFNE. In particular, the parasitic crossings (PC) lead to a substantial lifetime reduction of both beams in collision. This puts a limit on the maximum storable current and, as a consequence, on achievable peak and integrated luminosity. In order to alleviate the problem numerical and experimental studies of the PC compensation with current-carrying wires have been performed at DAFNE. Two such wires have been installed at both ends of the KLOE interaction region. Switching on the wires in accordance with the numerical predictions, improvement in the lifetime of the "weak" beam (positrons) has been obtained at the maximum current of the "strong" one (electrons) without luminosity loss. In this paper we describe the PC effects in DAFNE, summarize the results of numerical simulations on the PC compensation with the wires and discuss the experimental measurements and observations.  
MOPLS028 DAFNE Status Report 604
 
  • A. Gallo, D. Alesini, M.E. Biagini, C. Biscari, R. Boni, M. Boscolo, B. Buonomo, A. Clozza, G.O. Delle Monache, E. Di Pasquale, G. Di Pirro, A. Drago, A. Ghigo, S. Guiducci, M. Incurvati, P. Iorio, C. Ligi, F. Marcellini, C. Marchetti, G. Mazzitelli, C. Milardi, L. Pellegrino, M.A. Preger, L. Quintieri, R. Ricci, U. Rotundo, C. Sanelli, M. Serio, F. Sgamma, B. Spataro, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Vescovi, M. Zobov
    INFN/LNF, Frascati (Roma)
  • G. Benedetti
    CELLS, Bellaterra (Cerdanyola del Vallès)
  • L. Falbo
    INFN-Pisa, Pisa
  • J.D. Fox, P. Raimondi, D. Teytelman
    SLAC, Menlo Park, California
  • E. Levichev, S.A. Nikitin, P.A. Piminov, D.N. Shatilov
    BINP SB RAS, Novosibirsk
 
  The operation of DAFNE, the 1.02 GeV c.m. e+e- collider of the Frascati National Laboratory with the KLOE detector, started in April 2004 has been concluded at the end of March 2006 with a total delivered luminosity of 2 fb-1 on the peak of the Phi resonance, 0.2 fb-1 off peak and a high statistics scan of the resonance. The best performances of the collider during this run have been a peak luminosity of 1.5 1032 cm-2s-1 and a daily delivered luminosity of 10 pb-1. The KLOE detector has been removed from one of the two interaction regions and its low beta section substituted with a standard magnetic structure, allowing for an easy vertical separation of the beams, while the FINUDA detector has been moved onto the second interaction point. Several improvements on the rings have also been implemented and are described together with the results of machine studies aimed at improving the collider efficiency and testing new operating conditions.