THPLS031 Elettra Top-up Requirements and Design Status 3350
 
  • F. Iazzourene, S. Bassanese, A. Carniel, K. Casarin, R. De Monte, M. Ferianis, F. Giacuzzo, M. Lonza, G. Tromba, A. Vascotto
    ELETTRA, Basovizza, Trieste
 
  Elettra is a 2.5 GeV third generation light source in operation since 1993. To provide more stable beams to the users, we plan to operate in the so-called top-up injection mode. The first step is the substitution of the present 1GeV linac by a 100 MeV pre-injector linac and a fast cycling 2.5 GeV synchrotron booster foreseen to be in operation in 2007*. The present paper will report on the requirements for the top-up operation in terms of radiation safety, diagnostics H/S, timing, modality, etc. and the design status. In particular, a new BPM system, based on the log-ratio detectors, has been successfully commissioned on the present transfer line and linac and is ready to be deployed on the new injector and to be used by the new foreseen shot to shot transfer line booster to storage trajectory feedback system. Furthermore, in order to flatten the storage ring filling, the top-up charge will be integrated where needed. Preliminary measurements on the bunch by bunch measurement methods of the storage ring bunch charge are reported.

*“Elettra New Full Energy Injector Status Report”, these proceedings.

 
THPLS033 Elettra New Full Energy Injector Status Report 3356
 
  • M. Svandrlik, S. Bassanese, F.C. Cargnello, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, A. Gambitta, F. Giacuzzo, M. Giannini, F. Iazzourene, G.L. Loda, M. Lonza, F.M. Mazzolini, D.M. Morelli, G. Pangon, C. Pasotti, G. Penco, L.P. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
 
  The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booster synchrotron and two new beam transfer lines. It will replace the existing 1.2 GeV linac injector and transfer line. Full funding was finally available in 2005, which allowed to start, or in some cases to re-start, the construction activities. The status of the project will be presented in this paper, in particular the progress of the fabrication of various components, like magnets, power supplies, vacuum chambers; also the status of the construction of the building and technical plants will be given. Results of recent optimization studies will also be outlined. The commissioning of the new injector is scheduled to start in Spring 2007, while the first ELETTRA operation for user's with the new full energy injector is expected for the last quarter of 2007.