A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Uythoven, J.A.

Paper Title Page
MOPLS012 The LHC Sector Test 559
 
  • M. Lamont, R. Bailey, H. Burkhardt, B. Goddard, L.K. Jensen, O.R. Jones, V. Kain, A. Koschik, R.I. Saban, J.A. Uythoven, J. Wenninger
    CERN, Geneva
 
  The proposal to inject beam into a sector of the partially completed LHC is presented. The test will provide an important milestone, force preparation of a number of key systems, and allow a number of critical measurements with beam. The motivation for the test is discussed, along with the proposed beam studies, the radiation issues and the potential impact on ongoing installation. The demands on the various accelerator systems implicated are presented along with the scheduling of the preparatory steps, the test itself and the recovery phase.  
TUPLS013 Protection of the LHC against Unsynchronised Beam Aborts 1514
 
  • B. Goddard, R.W. Assmann, E. Carlier, J.A. Uythoven, J. Wenninger, W.J.M. Weterings
    CERN, Geneva
 
  An unsynchronised beam abort in the LHC could cause major damage to other downstream accelerator components, in particular the extraction septum magnets, the experimental low-beta triplet magnet apertures and the tertiary collimators. Although the LHC beam dumping system includes design features to minimise their frequency, such unsynchronised aborts can arise from several sources and cannot be excluded. A system of protection devices comprising fixed and moveable passive diluters and collimators will be built to safely protect the downstream LHC aperture from the mis-directed bunches in case of such a failure. The sources of unsynchronised abort events are described, together with the requirements and design of the protection devices and their expected performance. The accompanying operational requirements and envisaged solutions are discussed, in particular the problem of ensuring the local orbit at the protection devices.  
TUPLS015 Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets 1520
 
  • J.A. Uythoven, F. Castronuovo, L. Ducimetière, B. Goddard, G. Gräwer, F. Olivieri, L. Pereira, E. Vossenberg
    CERN, Geneva
 
  The LHC beam dumping system must protect the LHC machine from damage by reliably and safely extracting and absorbing the circulating beams when requested. Two sets of 15 extraction kicker magnets form the main active part of this system. They have been produced, tested and calibrated by measuring the integrated magnetic field and the magnet current at different beam energies. The calibration data have been analysed, and the critical parameters are compared with the specifications. Implications for the configuration, control and operation of the beam dumping system are discussed.  
WEPLS140 Update and Summary of the Dependability Assessment of the LHC Beam Dumping System 2706
 
  • R. Filippini, J.A. Uythoven
    CERN, Geneva
 
  The LHC Beam Dumping System (LBDS) must be able to remove the high intensity beams from the LHC accelerator on demand, at any moment during the operation. As the consequences of a major failure can be very severe, stringent safety requirements were imposed on the design. The final results of an in-depth dependability analysis on the LBDS are summarised, for one year of operation and different operational scenarios. The trade-off between safety and availability is discussed, along with the benefit from built-in features like redundancy, on-line surveillance and post-mortem diagnostics.