Paper | Title | Page |
---|---|---|
THPLS012 | Commissioning of the Australian Synchrotron Injector RF Systems | 3293 |
|
||
On December 16, 2003 the contract for the design, manufacture, installation and commissioning of the turnkey injector system for the Australian Synchrotron Project was awarded to industry. ACCEL Instruments is delivering the turnkey 100MeV linac and the booster RF system. Commissioning of the linac for ASP was performed in December 2005, right after successful commissioning of the Diamond Light Source injection linac*. The 500MHz booster cavity and related low level RF system will be commissioned after installation of the booster is finalised in early 2006. The paper will present design and layout information, as well as commissioning results.
*Commissioning of the Diamond Pre-Injector Linac (this conference). |