A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Tan, J.

Paper Title Page
MOPCH094 Low-intensity Beams for LHC Commissioning from the CERN PS-booster 255
 
  • M. Benedikt, J. Tan
    CERN, Geneva
 
  A variety of low-intensity beams will be required for LHC commissioning. In contrast to the nominal LHC physics beam, these single-bunch beams are produced without longitudinal bunch splitting in the injector chain. Consequently, not only the transverse but also the longitudinal beam characteristics have already to be established in the CERN PS-Booster. The required intensities extend down to four orders of magnitude below the typical PS-Booster working range and the transverse emittances must be adjustable to vary the beam brightness over a large range. The different beam variants are briefly summarized and the specific techniques developed for their production, like low-voltage rf capture, and transverse and longitudinal shaving, are described. In particular, the choice of harmonic number and its consequences for operation and beam reproducibility are discussed. Finally, the performance achieved for the different beams is summarized.  
TUPCH087 Beam Diagnostics with Schottky Noise in LEIR 1214
 
  • J. Tan, G. Tranquille
    CERN, Geneva
 
  The high density Lead ion beams, needed for LHC, are obtained in the Low Energy Ion Ring (LEIR) at CERN by multi-turn injection followed by electron cooling and stacking. During this injection and stacking phases where the circulating beam is unbunched, diagnostics with Schottky noise are used for probing essential beam parameters, such as tune, momentum spread, emittance and their evolution with time… The hardware facility and first results obtained during the recent commissioning of LEIR are described.