THPCH082 Broadband Bunch by Bunch Feedback for the ESRF using a Single High Resolution and Fast Sampling FPGA DSP 2976
 
  • E. Plouviez, P. Arnoux, F. Epaud, J. Jacob, J.M. Koch, N. Michel, G.A. Naylor, J.-L. Revol, V. Serriere, D. Vial
    ESRF, Grenoble
 
  In order to increase the current in the ESRF storage ring we have developed a set of multibunch feedback systems aimed at fighting longitudinal and transverse coupled bunch instabilities. The longitudinal feedback (LFB) has been the first system installed and tested. It was designed using the scheme developed at SLAC, ALS and INFN Frascati: bunch by bunch processing of a beam phase error signal and correction using a low Q kicker driven by a QPSK modulator. However, we took advantage for this development of the latest available technology for the signal processing electronics with high resolution, high sampling rate ADC and DAC, and FPGA DSP, as well as for the FPGA programming environment. It allowed us to substantially reduce the complexity: the algorithm runs on a single processor, the kicker requires only 200W of RF power to control a 6GeV beam, and the implementation took only about one year. We will describe the main features of our LFB and present the results already achieved in the damping of instabilities driven by our RF cavity HOM. We will also report on the status of the transverse feedback, which is being built up using the same FPGA system as the longitudinal one.  
THPLS011 Operation and Recent Development at the ESRF 3290
 
  • J.-L. Revol, J.C. Biasci, J-F. B. Bouteille, J. Chavanne, P. Elleaume, L. Farvacque, L. Hardy, J. Jacob, G.A. Naylor, E. Plouviez, A. Ropert, K.B. Scheidt
    ESRF, Grenoble
 
  We report on the achieved performance of the ESRF storage ring as well as developments accomplished or underway. A new hybrid filling mode based on groups of bunches and a 4-bunch filling pattern are now delivered to the users. Following the increasing demand of users for beam stability, the fast orbit feedback has been upgraded. The installation of 5 m-long, 8 mm vertical aperture NEG coated aluminum chambers is progressing at a rate of one chamber per shutdown. The increase in current from 200 to 300 mA is being prepared; however, operation in this mode is still impaired by HOM driven longitudinal instabilities. To overcome this difficulty, a longitudinal feedback is being commissioned. HOM damped cavities are also under study to possibly replace the existing five-cell cavities. The policy of preventive maintenance has been continued. However, in 2005 the machine availability was affected by water leaks occurring on front-end absorbers and on one dipole crotch absorber. The crotch absorbers suffer all from the same erosion process that could be delayed by a systematic vertical realignment, leaving time for procurement and replacement of the entire pool.