A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Piquet, O.

Paper Title Page
MOPCH106 An Innovative Method to Observe RFQ Vanes Motion with Full-scale RF Power and Water Cooling 288
 
  • A. France, O. Piquet
    CEA, Gif-sur-Yvette
  • R. Ferdinand
    GANIL, Caen
 
  The design of high current RFQs is heavily strained by thermo-mechanical considerations, which eventually have an impact on machining costs, cooling systems, etc. A 1-meter long copper prototype of the SPIRAL2 RFQ has been specifically built to corroborate design options. An innovative method has been developed, allowing real-time observation of mechanical deformations of RFQ vanes, with full-scale RF power and water cooling. Digital images are acquired by a CCD camera, and processed by a dedicated software. Processing includes contrast stretching, low-pass filtering, and block-correlation followed by interpolation. Sub-pixel relative motions of RFQ electrode ends are clearly detected and measured, with RMS errors of the order of 0.6 microns.  
MOPCH107 Tuning Procedure of the 6 Meter IPHI RFQ 291
 
  • O. Piquet, M. Desmons, A. France
    CEA, Gif-sur-Yvette
 
  In the framework of the IPHI project (High Intensity Proton Injector), the RFQ cavity is divided into 6 sections of 1 meter each, and assembled in 3 segments separated by coupling plates. We will present the tuning procedure of the aluminium RFQ cold model to set the accelerating mode frequency, a flat voltage profile and to minimize the dipole components of the accelerating voltage. This tuning procedure can be divided in three steps. First, dipole mode frequencies are adjusted with rods for the 3 separated segments. Second, RFQ end cells and coupling cells are tuned by mechanical machining of tuning plates. Third, using a fully automated bead-pull for the measurement of the field distribution inside every RFQ quadrants, the RFQ is tuned with 96 plungers in a small number of iterations. Tuning this 6-meter long cold model is a comprehensive training in view of the future tuning of the copper RFQ with the variable voltage profile.  
MOPCH103 SPIRAL2 RFQ Prototype – First Results 282
 
  • R. Ferdinand, R. Beunard, V. Desmezières, M. Di Giacomo, P. Robillard
    GANIL, Caen
  • A.C. Caruso
    INFN/LNS, Catania
  • S. Cazaux, M. Desmons, A. France, D. Leboeuf, O. Piquet, J.-C. Toussaint
    CEA, Gif-sur-Yvette
  • M. Fruneau, Y. Gómez-Martínez
    LPSC, Grenoble
 
  The SPIRAL2 RFQ has been designed to accelerate a 5 mA deuteron beam (Q/A=1/2) or a 1 mA particle beam with q/A=1/3 up to 0.75 MeV/A at 88MHz. It is a CW machine which has to show stable operation, provide the required availability and reduce losses to a minimum in order to minimize the activation constraints. Extensive modelisation was done to ensure a good vane position under RF. The prototype of this 4-vane RFQ has been built and tested in INFN-LNS Catania and then in IN2P3-LPSC Grenoble. It allowed us to measure the vacuum quality, the RF field by X-ray measurements, the cavity displacement and the real vane displacement during the RF injection. Different techniques were used, including an innovative and effective CCD measurement with a 0.6 μm precision. This paper outlines the different results.  
TUPCH186 Low Level RF System Development for SOLEIL 1447
 
  • P. Marchand, M.D. Diop, F. Ribeiro, R.S. Sreedharan
    SOLEIL, Gif-sur-Yvette
  • M. Luong, O. Piquet
    CEA, Gif-sur-Yvette
 
  The Low Level RF system that is used in the SOLEIL storage ring consists in fully analog "slow" amplitude, phase and frequency loops, complemented with a direct RF feedback. A fast digital FPGA-based I/Q feedback, currently under development, will be implemented later on. The performance of both systems has been evaluated using a Matlab-Simulink-based simulation tool. The computed and first experimental results are reported.