MOPCH065 |
Fabrication and Installation of Superconducting Accelerator Modules for the ERL Prototype (ERLP) at Daresbury
|
178 |
|
- P. vom Stein, S. Bauer, M. Pekeler, H. Vogel
ACCEL, Bergisch Gladbach
- R. Bate, C.D. Beard, D.M. Dykes, P.A. McIntosh, B. Todd
CCLRC/DL/ASTeC, Daresbury, Warrington, Cheshire
|
|
|
Installation and commissioning of the superconducting energy recovery linac(ERL) prototype is under way at Daresbury Laboratory. ACCEL have manufactured two superconducting accelerator modules for the injector and the linac, operating at 2K with 1.3 GHz TESLA type cavities. Each module contains two cavities and is designed to provide an accelerating voltage of 25 MV in cw mode. This paper presents details of the module fabrication, cavity preparation and performance results. An overview of the cryogenic installations for the modules is given and status results of the commissioning are discussed.
|
|
MOPCH164 |
Status of the Diamond Storage Ring Radio Frequency System
|
445 |
|
- M. Jensen, M. Maddock, S.A. Pande, S. Rains, A. F. Rankin, D. Spink, A.V. Watkins
Diamond, Oxfordshire
- J. Alex, M. Mueller
Thomson Broadcast & Multimedia AG, Turgi
- B. A. Aminov
CRE, Wuppertal
- M. Pekeler
ACCEL, Bergisch Gladbach
|
|
|
The installation and commissioning of the Diamond Storage Ring RF system is nearing completion. Diamond will initially operate with two RF high power amplifiers and two cavities. The key components in each RF system are a 300 kW amplifier implemented through the combination of four 80 kW IOTs, a 500 MHz superconducting cavity providing up to 2 MV of accelerating voltage and an advanced analogue IQ Low Level RF (LLRF) system to control the cavity frequency, voltage and phase. We present here an update on the recent installation and early commissioning results of the RF systems.
|
|
TUPLS033 |
First Stage of a 40 MeV Proton Deuteron Accelerator Commissioning Results
|
1562 |
|
- C. Piel, K. Dunkel, M. Pekeler, H. Vogel, P. vom Stein
ACCEL, Bergisch Gladbach
|
|
|
In 2006 the first stage of a 40MeV superconducting linear accelerator for protons and deuterons will be commissioned at SOREQ. This paper will present commissioning of the ECR source after final assembly. First results of the 1.5MeV/u cw RFQ are expected, further test results of the beta=0.09 half wave superconducting resonators are presented, and resonator geometry improvements with respect to electron multipacting behaviour will be discussed. An outlook on the project with respect to achieve the final energy of 40MeV will be given.
|
|