Nakayama, H.

Paper Title Page
TUPLS076 Beam Extraction of 150 MeV FFAG 1672
 
  • M. Aiba, Y. Mori, H. Nakayama, K. Okabe, Y. Sakamoto, A. Takagi
    KEK, Ibaraki
  • R. Taki
    GUAS/AS, Ibaraki
  • Y. Yonemura
    Kyushu University, Fukuoka
 
  A beam extraction from FFAG accelerator was performed for the first time at KEK 150MeV proton FFAG synchrotron. The purpose of 150MeV FFAG project is to establish a working prototype for various applications. The beam extraction is thus one of important goals. The extraction is based on fast extraction methode using kicker and pulse septum working at 100Hz. A rapid cycling is also our focus to take advantages of FFAG accelerator. Beam extraction experiment was successful under 100Hz operating. The details of experiment will be presented in this paper.  
TUPLS106 Pulsed Bending Magnet of the J-PARC MR 1747
 
  • K. Koseki, H. Kobayashi, H. Nakayama, K.O. Okamura, M.J. Shirakata, M. Tawada
    KEK, Ibaraki
 
  Japan Proton Accelerator Research Complex (J-PARC) is under construction with a collaboration between Japan Atomic Energy Agency (JAEA) and High Energy Accelerator Research Organization (KEK). The J-PARC consists of a 180 MeV linac, a 3 GeV rapid-cycle synchrotron (RCS) and a 50 GeV synchrotron (MR). The bunch trains, which extracted from the RCS, is delivered both to the “Materials and Life Science Facility” and to the MR, two beam transport lines, 3-NBT and 3-50BT, are constructed. The switching of bunch trains is performed by a pulsed bending magnet. The field strength of 1.21 Tesla with rise and fall time of less than 40 msec is required. It was found that an effect induced by eddy current, which flows at thick end-plates, disturbs the flatness of the magnetic field. A simple compensation circuit has been adopted for a cure. A result from a field measurement, which shows a sufficient flatness, is presented.  
TUPLS113 Designs of Septum Magnet at 3 GeV RCS in J-PARC 1768
 
  • M. Yoshimoto, Y. Irie, J. Kamiya, M. Kinsho, T. Takayanagi, O. Takeda, M. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Fujimori, S. Igarashi, H. Nakayama
    KEK, Ibaraki
 
  3 GeV RCS (Rapid Cycling Synchrotron) at J-PARC (Japan Proton Accelerator Research Complex) consists in many kinds of septum magnets. There are two septum magnets to inject the beam into the ring, three septum magnets to extract the beam for the users, and two septum magnets to dump the beam which can not be exchanged its charge at the first foil. In order to reduce the magnetic leakage field from the septum magnets at the beam orbit in the ring, the silicon steel sheets are set at the outside of the septum magnets for the magnetic shields. However sufficient spaces to set the thick magnetic shields are not securable at the divergent duct areas. Therefore the vacuum chambers are made by the magnetic stainless steel and the leakage fields in the chambers can be reduced. As results of the 3D field calculations by TOSCA, the magnetic leakage field can be suppressed to a few Gauss or less.