A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Mourier, J.

Paper Title Page
MOPLS101 Beam Dynamics and First Operation of the Sub-harmonic Bunching System in the CTF3 Injector 795
 
  • P. Urschütz, H.-H. Braun, G. Carron, R. Corsini, S. Doebert, T. Lefevre, G. McMonagle, J. Mourier, J.P.H. Sladen, F. Tecker, L. Thorndahl, C.P. Welsch
    CERN, Geneva
 
  The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme by 2010. The CTF3 drive beam generation scheme relies on the use of a fast phase switch of a sub-harmonic bunching system in order to phase-code the bunches. The amount of charge in unwanted satellite bunches is an important quantity, which must be minimized. Beam dynamics simulations have been used to study the problem, showing the limitation of the present CTF3 design and the gain of potential upgrades. In this paper the results are discussed and compared with beam measurements taken during the first operation of the system.  
TUPCH144 Automatic Conditioning of the CTF3 RF System 1355
 
  • J.P.H. Sladen, S. Deghaye, S. Livesley, J. Marques Balula, J. Mourier, J.-M. Nonglaton
    CERN, Geneva
  • A. Dubrovsky
    JINR, Dubna, Moscow Region
 
  The RF system of CTF3 (CLIC Test Facility 3) includes ten 35 MW to 40 MW 3 GHz klystrons and one 20 MW 1.5 GHz klystron. High power RF conditioning of the waveguide network and cavities connected to each klystron can be extremely time consuming. Because of this, a fully automatic conditioning system has been developed within a CERN JINR (Dubna) collaboration. It involves relatively minor hardware additions, most of the work being in application and front-end software. The system has already been used very successfully.