A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Lonza, M.

Paper Title Page
THPCH045 Transverse Head-tail Modes Elimination with Negative Chromaticity and the Transverse Multi-bunch Feedback System at ELETTRA 2886
 
  • E. Karantzoulis, M. Lonza
    ELETTRA, Basovizza, Trieste
 
  The rigid dipole head-tail mode threshold at ELETTRA is by now quite low and increasing positively the chromaticity does not bring a much overall advantage in the machine performance. Using the bunch-by-bunch transverse feedback (TMFB), a threshold increase has been observed until the onset of the higher modes, which being bunch shape modes cannot be detected and therefore eliminated by the feedback system. To overcome this problem the machine has been set to a small but negative chromaticity. In this case the m=0 mode is unstable with a very low (<1 mA/bunch) threshold but the higher modes should be stable, especially when the main source of the transverse impedance comes from the resistive wall as in our case. Indeed when activating the TMFB no onset of any modes was observed within reasonable current limits (15 mA/bunch) that we plan to further investigate. In the paper after a theoretical discussion on the role of chromaticity and various types of impedances in the head-tail onset mechanism, the experimental results are presented and discussed.  
THPCH091 Status of the ELETTRA Global Orbit Feedback Project 3003
 
  • M. Lonza, D. Bulfone, R. De Monte, V. Forchi', G. Gaio
    ELETTRA, Basovizza, Trieste
 
  A fast digital feedback system is under development to stabilize the electron beam closed orbit at the ELETTRA storage ring in the band up to 300 Hz. In view of the implementation of the feedback, the existing orbit measurement system will be upgraded to allow for better accuracy in the beam position measurement and higher acquisition rate. A global correction algorithm running on a number of distributed processing units will correct the orbit using all of the storage ring steerer magnets. The status of the project development is given in this article.  
THPLS031 Elettra Top-up Requirements and Design Status 3350
 
  • F. Iazzourene, S. Bassanese, A. Carniel, K. Casarin, R. De Monte, M. Ferianis, F. Giacuzzo, M. Lonza, G. Tromba, A. Vascotto
    ELETTRA, Basovizza, Trieste
 
  Elettra is a 2.5 GeV third generation light source in operation since 1993. To provide more stable beams to the users, we plan to operate in the so-called top-up injection mode. The first step is the substitution of the present 1GeV linac by a 100 MeV pre-injector linac and a fast cycling 2.5 GeV synchrotron booster foreseen to be in operation in 2007*. The present paper will report on the requirements for the top-up operation in terms of radiation safety, diagnostics H/S, timing, modality, etc. and the design status. In particular, a new BPM system, based on the log-ratio detectors, has been successfully commissioned on the present transfer line and linac and is ready to be deployed on the new injector and to be used by the new foreseen shot to shot transfer line booster to storage trajectory feedback system. Furthermore, in order to flatten the storage ring filling, the top-up charge will be integrated where needed. Preliminary measurements on the bunch by bunch measurement methods of the storage ring bunch charge are reported.

*“Elettra New Full Energy Injector Status Report”, these proceedings.

 
THPLS033 Elettra New Full Energy Injector Status Report 3356
 
  • M. Svandrlik, S. Bassanese, F.C. Cargnello, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, A. Gambitta, F. Giacuzzo, M. Giannini, F. Iazzourene, G.L. Loda, M. Lonza, F.M. Mazzolini, D.M. Morelli, G. Pangon, C. Pasotti, G. Penco, L.P. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
 
  The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booster synchrotron and two new beam transfer lines. It will replace the existing 1.2 GeV linac injector and transfer line. Full funding was finally available in 2005, which allowed to start, or in some cases to re-start, the construction activities. The status of the project will be presented in this paper, in particular the progress of the fabrication of various components, like magnets, power supplies, vacuum chambers; also the status of the construction of the building and technical plants will be given. Results of recent optimization studies will also be outlined. The commissioning of the new injector is scheduled to start in Spring 2007, while the first ELETTRA operation for user's with the new full energy injector is expected for the last quarter of 2007.