A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Liu, D.K.

Paper Title Page
THPLS046 The Status of Instrumentation and Control for SSRF 3392
 
  • D.K. Liu
    SINAP, Shanghai
 
  The SSRF (Shanghai Synchrotron Radiation Facility) was started in December 25, 2004, and is located in the Zhang Jiang Hi-Teck park in Shanghai. During the past one year, the main structure is under construction and will be completed in the middle of next year on schedule. Various equipment is being processed and tested. The preliminary design of the control system, including various hardware and software, are completed, and some prototype of IOC with EPICS such as LINAC rf station, magnet station and beam diagnosis station, etc. have been already tested successfully. The digital power supply control will be adopted. Various beam instrumentation have been designed for diagnostics of the LINAC, booster and storage ring. The performance of the design, progress of the subsystem and preliminary test results of the prototype will be described in this paper in detail.