TUPLS110 Measurement of the Extraction Kicker System in J-PARC RCS 1759
 
  • J. Kamiya, M. Kinsho, M. Kuramochi, T. Takayanagi, O. Takeda, T. Ueno, M. Watanabe, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
  Kicker magnet system in the J-PARC RCS is now under construction at JAEA (Japan Atomic Energy Agency). Their role in RCS is to kick the accelerated 3 GeV proton beam to the following extraction line at a repetition rate of 25 Hz. There are three kinds of kicker magnets (S, M, L), distinguished by the difference in the size of their apertures. The specification of 2 % is required on the magnetic field in terms of homogeneity in time and space from the beam optical point of view. The required flatness of the temporal uniformity was accomplished by superposing the waveforms of the two kicker magnet*. The required specification to the special uniformity is also very severe to achieve because our kicker magnet is designed with a large aperture in order to accept a maximum beam power of 1 MW. We established the search coil as a detector and 3-axes stage to perform magnetic field mapping. In order to reduce the signal noises and detect the stable output signals, matching register and integrated circuit were carefully selected. The 3-axes stage was precisely aligned. The distribution of the magnetic field (By) and integrated BL were systematically measured for the three types of kickers.

*J. Kamiya et al. “Magnetic field measurement of the extraction kicker magnet in J-PARC RCS,” submitted for publication to the proceedings of the 19th International Conference on Magnet Technology.

 
TUPLS111 Experimental Results of the Shift Bump Magnet in the J-PARC 3-GeV RCS 1762
 
  • T. Takayanagi, Y. Irie, J. Kamiya, M. Kinsho, M. Kuramochi, O. Takeda, T. Ueno, M. Watanabe, Y. Yamazaki, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
  The shift bump magnet produces a fixed main bump orbit to merge the injection beam into the circulating beam. In order to control the injection beam for the short injection time (500 microseconds) with sufficient accuracy, the shift bump magnet needs a wide uniform magnetic field and the high speed exciting pattern of the high current. The magnetic field design and the structural analysis of the shift bump magnets have been performed using three-dimensional electromagnetic analysis code and mechanical analysis code, respectively. The magnetic field distributions were measured with a long search coil, thus giving a BL product over a magnet gap area. The temperature distributions at the various points of the magnet were measured by thermocouples over 24 hours till they saturated. General trend of these measurements agrees well with calculations.