A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kersevan, R.

Paper Title Page
TUPCH171 Calculation, Measurement and Analysis of Vacuum Pressure Data and Related Bremsstrahlung Levels on Straight Sections of the ESRF 1417
 
  • R. Kersevan, P. Berkvens, P. Colomp
    ESRF, Grenoble
 
  One of the major personal safety issues of modern synchrotron radiation (SR) light sources is the minimization of the exposure of beamline staff and users to high-energy bremsstrahlung (BS) radiation generated in the straight sections of the storage ring and entering the optics hutches of the beamlines. This is particularly important when insertion device (ID) narrow-gap chambers are installed, nowadays characterized by very low specific conductances. At the ESRF, this has led to the implementation of systematic measurements of BS levels and vacuum conditioning curves, in conjunction with the installation of non-evaporable getter (NEG)-coated ID chambers. A dedicated beamline is used to do on-axis measurements of the BS intensity during the initial conditioning period of newly installed NEG-coated ID chambers. This paper will show results of measurements and calculations performed throughout the years, and comment on the suitability from the radiation safety point of view of the installation of NEG-coated chambers in large numbers around the ring.  
TUPCH172 Status Report on the Performance of NEG-coated Chambers at the ESRF 1420
 
  • R. Kersevan, M. Hahn, i. Parat
    ESRF, Grenoble
 
  At the ESRF, the use of NEG-coated narrow gap chambers for insertion device (ID) straight sections has become the standard choice for in-air IDs. A total of 25 chambers have been installed at different times in the ring, with 19 being installed as of Jan 2006, for a total length of 82 m. The vacuum performance has been excellent for all but one of them. It has been found that the now standard "10mm" design, i.e. a 5 m-long, 57x8 mm2 ellipse, is compatible with the multi-bunch operation at 200 mA. Runs at higher currents, performed in preparation of current upgrades, have gone smoothly. During 2005, a 3.5 m-long prototype of a chamber suited for installation in the achromat part of the lattice has been installed in the ring. It was characterized by a much smaller cross-section (30x20 mm2, HxV) as compared to a standard chamber (74x33 mm2, HxV), and by the absence of three lumped pumps, replaced by the NEG-coating. The data taken during a full run have been extremely encouraging, to the point of considering the adoption of a similar design for a future upgrade of the storage ring lattice and vacuum system. A status report will be given, alongside with a discussion of future plans.