A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kazakov, A.

Paper Title Page
THPCH115 Timing System Upgrade for Top-up Injection at KEK Linac 3071
 
  • K. Furukawa, E. Kadokura, A. Kazakov, M. Satoh, T. Suwada
    KEK, Ibaraki
 
  KEK Linac provides electrons and positrons to Photon Factory (PF) and B-Factory (KEKB). Because of the nature of those factory machines both quantity and quality of the beams are required. In order to improve the injections, quasi top-up injections of electrons to PF and KEKB rings have been planned and a new beam transport line was built. Fast beam switching mechanisms are being developed and installed. The timing and control system is also reinforced to realize fast (50Hz) switching of rf timing pulses, low-level rf, beam instrumentation parameters, and beam feedback parameters. The present timing system provides precise (jitters down to 5ps) timing pulses to 150 devices. Many of the signals will be upgraded to enable the fast switching scheme with an event system. At the same time a double-fold synchronization between asynchronous Linac and PF rf signals was developed to achieve precise injection timing mainly because both rings have independent circumference correction systems.