A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kamps, T.

Paper Title Page
TUPCH009 Beam Measurements and Manipulation of the Electron Beam in the BESSY-II Transferline for Topping Up Studies 1010
 
  • T. Kamps, P. Kuske, D. Lipka
    BESSY GmbH, Berlin
 
  The BESSY-II storage ring based synchrotron radiation source will be upgraded to allow for continuous topping up operation. In order to achieve a high injection efficiency between the booster synchrotron and the storage ring, the transferline will be equipped with novel beam size monitors and collimators. This paper describes the collimator design and first beam measurements of the transverse emittance. The transverse emittance is measured using the quadrupole scan technique. The data taking and the analysis procedure is given together with results and comparision with simulations.  
WEPLS043 Progress of the Rossendorf SRF Gun Project 2469
 
  • D. Janssen, A. Arnold, H. Buettig, R. Hempel, U. Lehnert, P. Michel, K. Moeller, P. Murcek, Ch. Schneider, R. Schurig, F. Staufenbiel, J. Teichert, R. Xiang
    FZR, Dresden
  • T. Kamps, D. Lipka, F. Marhauser
    BESSY GmbH, Berlin
  • W.-D. Lehmann
    IfE, Dresden
  • J. Stephan
    IKST, Drsden
  • V. Volkov
    BINP SB RAS, Novosibirsk
  • I. Will
    MBI, Berlin
 
  In this paper we report the status and the progress of the superconducting RF gun project in Rossendorf. The gun is designed for cw operation mode with 1 mA current and 10 MeV electron energy. The cavity consists of three cells with TESLA geometry, a special designed half-cell in which the photo cathode will be inserted and a choke filter, which prevents the leakage of RF power by the coaxial line between the cathode and the cavity cell. A double tuner allows the tuning of the half-cell and the TESLA cells separately. In 2005 the fabrication of two cavities with RRR300 and RRR40 was finished. We present the results of the field measurement and the warm tuning of the cavity cells as well as the tuning and performance measurement of the choke filter. The fabrication of the double tuner has been also finished. In a test bench we measured the properties of the tuner (tuning range, resolution) at LN2 temperature. Further activities concern the diagnostic beam line of the gun, the new cathode preparation and cathode transfer system, the driver laser and the LHe transfer line.  
MOPLS080 A Laser-wire System at the ATF Extraction Line 738
 
  • S.T. Boogert, G.A. Blair, G.E. Boorman, A. Bosco, L. Deacon, C. Driouichi
    Royal Holloway, University of London, Surrey
  • A. Aryshev, H. Hayano, V. Karataev, K. Kubo, N. Terunuma, J. Urakawa
    KEK, Ibaraki
  • A. Brachmann, J.C. Frisch, M.C. Ross
    SLAC, Menlo Park, California
  • N. Delerue
    JAI, Oxford
  • S. Dixit, F.B. Foster, G.F. Gannaway, D.F. Howell, Q.M. Qureshi, A. Reichold, R. Senanayake
    OXFORDphysics, Oxford, Oxon
  • L.J. Jenner
    Cockcroft Institute, Warrington, Cheshire
  • T. Kamps
    BESSY GmbH, Berlin
 
  A new laser-wire system has been installed at the ATF extraction line at KEK, Tsukuba. The system aims at a micron-scale laser spot size and employs a mode-locked laser system. The purpose-built interaction chamber, light delivery optics, and lens systems are described, and the first results are presented.  
TUPCH050 Beam Profile Measurements with the 2-D Laser-wire 1121
 
  • G.A. Blair, I.V. Agapov, S.T. Boogert, G.E. Boorman, A. Bosco, J. Carter, C. Driouichi, M.T. Price
    Royal Holloway, University of London, Surrey
  • K. Balewski, H.-C. Lewin, F. Poirier, S. Schreiber, K. Wittenburg
    DESY, Hamburg
  • N. Delerue, D.F. Howell
    OXFORDphysics, Oxford, Oxon
  • T. Kamps
    BESSY GmbH, Berlin
 
  A new laser-wire system has been installed at the PETRA ring at DESY, Hamburg. The system is set up to scan in two dimensions using piezo-driven mirrors and employs a newly acquired injection seeded Q-switched laser. The system is described and first results are presented.