TUPLS010 New Beam Transport Line from LINAC to Photon Factory in KEK 1505
 
  • N. Iida, K. Furukawa, M. Ikeda, K. Kakihara, T. Kamitani, M. Kikuchi, Y. Kobayashi, T. Mitsuhashi, Y. Ogawa, M. Satoh, T. Suwada, M. Tawada, K. Yokoyama
    KEK, Ibaraki
 
  The e+/e- injector LINAC in KEK usually injects into four rings which are Low Energy Ring (LER) of KEKB (3.5GeV/e+), High Energy Ring (HER) of KEKB(8.0GeV/e-), Photon Factory (PF)(2.5GeV/e-) and Advanced Ring for pulse x-rays (PF-AR)(3.0GeV/e-). While LINAC continuously injects into LER and HER alternately about every five minutes, both of the KEKB rings usually store almost full operating currents. Time for PF or PF-AR, which includes switching time, took about 20 minutes several times a day. During this, the storage currents in KEKB rings decreased, and the optimum points of luminosity tuning had been lost. It had taken more than two hours to recover the luminosity. It is so useful for KEKB to shorten the time for switch LINAC KEKB to/from PF or PF-AR. In summer of 2005, the transport line from LINAC to PF were renewed, in which a DC bending magnet only for PF line apportions electron beam from the end of LINAC to the new line. We succeeded to reduce the occupancy time for PF injection to about five minutes. In this paper design of the new PF beam transport line and the practical performance achieved according to the design are described.