Paper |
Title |
Page |
WEPLS132 |
New Magnet Power Supply for PAL Linac
|
2685 |
|
- S.-C. Kim, J. Choi, K.M. Ha, J.Y. Huang, J.H. Kim, S.H. Kim, I.S. Ko, S.S. Park
PAL, Pohang, Kyungbuk
|
|
|
Since the completion of PLS in 1994, PLS Linac magnet power supply(MPS) has been operated for 12 years with 12-bit resolution and 0.1% stability. Improvement in the resolution and the reliability of the Linac MPS is highly required now for the stable beam injection and 4th generation light source research. To improve MPS, we developed new compact MPS of 16-bit resolution and 20ppm stability using four-quadrant switching scheme with 50kHz MOSFET switching device. Bipolar MPS for corrector magnet consists of main power board, control power board, regulator board and CPU board. Size of each board is only 100mm width and 240mm depth. Unipolar MPS for quadrupoles and solenoid magnets is composed by parallel-operation of two main power boards, doubling the current output. Output of MPS is 10V, ±10A for the bipolar and 50V, 50A for the unipolar magnet. In this paper, we report on the development and characteristics of the new MPS for PAL linac.
|
|
THPCH177 |
Design and Construction of the PEFP Timing System for a 20 MeV Proton Beam
|
3212 |
|
- Y.-G. Song, Y.-S. Cho, H.M. Choi, I.-S. Hong
KAERI, Daejon
- K.M. Ha, J.H. Kim
PAL, Pohang, Kyungbuk
|
|
|
The timing system of the PEFP requires synchronization for the accelerator and for the multipurpose beam line. The system is based on an event distribution system that broadcasts the timing information globally to all the equipment. Fast I/O hardware of the timing system is to distribute appropriate timing signals to accelerator systems, including the Injector, RFQ, DTL, and user's facilities. Signals to be distributed include the synchronized pulse triggers and event information of RF system and switching magnet power supplies for the 20MeV proton beam extraction.
|
|