A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Eriksson, T.

 
Paper Title Page
WEOBPA02 LEIR Commissioning 1876
 
  • C. Carli, P. Beloshitsky, L. Bojtar, M. Chanel, K. Cornelis, B. Dupuy, J. Duran-Lopez, T. Eriksson, S.S. Gilardoni, D. Manglunki, E. Matli, S. Maury, C. Oliveira, S. Pasinelli, J. Pasternak, F. Roncarolo, G. Tranquille
    CERN, Geneva
 
  The Low Energy Ion Ring (LEIR) is a central piece of the injector chain for LHC ion operation, transforming long Linac 3 pulses into high density bunches needed for LHC. LEIR commissioning is scheduled to be completed at the time of the conference. A review of LEIR commissioning highlighting expected and unexpected problems and actions to tackle them will be given.  
slides icon Transparencies