Paper |
Title |
Page |
THPLS058 |
MAX III Commissioning
|
3416 |
|
- M. Eriksson, M. Bergqvist, M. Brandin, L.-J. Lindgren, M. Sjöström, S. Thorin
MAX-lab, Lund
|
|
|
Some of the features of the 700 MeV MAX III synchrotron radiation storage ring are presented, and the commissioning of this ring is described.
|
|
THPLS059 |
Status of the MAX IV Light Source Project
|
3418 |
|
- M. Eriksson, M. Berglund, K.I. Blomqvist, M. Brandin, T. Hansen, D. Kumbaro, L.-J. Lindgren, L. Malmgren, M. Sjöström, H. Svensson, H. Tarawneh, S. Thorin, E.J. Wallén, S. Werin
MAX-lab, Lund
- B. Anderberg
AMACC, Uppsala
|
|
|
The present development of the accelerator part of the MAX IV synchrotron radiation project is presented. The main features of the 3 GeV injector linac and the two storage rings operated at different electron energies to cover a broad spectral range of high brilliance undulator radiation are described in some detail. A third ring, the existing MAX III ring, is planned to be transferred to the new facility. The preparation of the injector linac to serve as a free electron laser source and the major sub-systems of the facility are also presented.
|
|