MOPLS015 Quality Control Techniques Applied to the Large Scale Production of Superconducting Dipole Magnets for LHC 568
 
  • F. Savary, M. Bajko, J. Beauquis, G. De Rijk, N. Emelianenko, P. Fessia, P. Hagen, J. Miles, L. Rossi, E. Todesco, J. Vlogaert, C. Vollinger, E.Y. Wildner
    CERN, Geneva
 
  The LHC accelerator, under construction at CERN, is characterized by the use on a large scale of high field superconducting dipoles: the 27-km ring requires 1232 15-m long dipole magnets designed for a peak field of 9 T. The coils are wound with Rutherford-type cable based on copper-stabilized Nb-Ti superconductors and will be operated at 1.9 K in pressurized superfluid helium. The challenge that had to be faced has been an efficient, cost-effective and reproducible mass production to very tight tolerances: the field quality must be better than 10-4 and the geometry of the cold bore tube and magnet controlled to 0.1 mm over the whole length, any deviation being liable to induce delays and significant cost increase. This paper presents the main methods and tools chosen to face successfully this challenge: some methods were foreseen in the technical specification, others were implemented based on the experience gained in several years of fabrication.  
TUPLS005 Preliminary Study of Using "Pipetron"-type Magnets for a Pre-accelerator for the LHC Collider 1493
 
  • G. De Rijk, L. Rossi
    CERN, Geneva
  • H. Piekarz
    Fermilab, Batavia, Illinois
 
  One of the luminosity limitations of the LHC is the rather low injection energy (0.45 TeV) with respect to the collision energy (7 TeV). The magnetic multipoles in the main dipoles at low field and their dynamic behaviour are considered to limit the achievable bunch intensity and emittance. We report on a preliminary study to increase the injection energy to 1.5 TeV using a two beam pre-accelerator (LHCI) in the LHC tunnel. The LHCI is based on "Pipetron" magnets as originally proposed for the VLHC. The aim of the study is to assess the feasibility and to identify the critical processes or systems that need to be investigated and developed to render such a machine possible.  
WEPLS100 Performance of LHC Main Dipoles for Beam Operation 2610
 
  • G. De Rijk, M. Bajko, L. Bottura, M.C.L. Buzio, V. Chohan, L. Deniau, P. Fessia, J. Garcia Perez, P. Hagen, J.-P. Koutchouk, J. Kozak, J. Miles, M. Missiaen, M. Modena, P. Pugnat, V. Remondino, L. Rossi, S. Sanfilippo, F. Savary, A.P. Siemko, N. Smirnov, A. Stafiniak, E. Todesco, D. Tommasini, J. Vlogaert, C. Vollinger, L. Walckiers, E.Y. Wildner
    CERN, Geneva
 
  At present about 75% of the main dipoles for the LHC have been manufactured and one of the three cold mass assemblers has already completed the production. More than two third of the 1232 dipoles needed for the tunnel have been tested and accepted. In this paper we mainly deal with the performance results: the quench behavior, the magnetic field quality, the electrical integrity quality and the geometry features will be summarized. The variations in performance associated with different cold mass assemblers and superconducting cable origins will be discussed.