A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Bouteille, J-F. B.

Paper Title Page
THPLS011 Operation and Recent Development at the ESRF 3290
 
  • J.-L. Revol, J.C. Biasci, J-F. B. Bouteille, J. Chavanne, P. Elleaume, L. Farvacque, L. Hardy, J. Jacob, G.A. Naylor, E. Plouviez, A. Ropert, K.B. Scheidt
    ESRF, Grenoble
 
  We report on the achieved performance of the ESRF storage ring as well as developments accomplished or underway. A new hybrid filling mode based on groups of bunches and a 4-bunch filling pattern are now delivered to the users. Following the increasing demand of users for beam stability, the fast orbit feedback has been upgraded. The installation of 5 m-long, 8 mm vertical aperture NEG coated aluminum chambers is progressing at a rate of one chamber per shutdown. The increase in current from 200 to 300 mA is being prepared; however, operation in this mode is still impaired by HOM driven longitudinal instabilities. To overcome this difficulty, a longitudinal feedback is being commissioned. HOM damped cavities are also under study to possibly replace the existing five-cell cavities. The policy of preventive maintenance has been continued. However, in 2005 the machine availability was affected by water leaks occurring on front-end absorbers and on one dipole crotch absorber. The crotch absorbers suffer all from the same erosion process that could be delayed by a systematic vertical realignment, leaving time for procurement and replacement of the entire pool.