|
- A. Gallo, D. Alesini, M.E. Biagini, C. Biscari, R. Boni, M. Boscolo, B. Buonomo, A. Clozza, G.O. Delle Monache, E. Di Pasquale, G. Di Pirro, A. Drago, A. Ghigo, S. Guiducci, M. Incurvati, P. Iorio, C. Ligi, F. Marcellini, C. Marchetti, G. Mazzitelli, C. Milardi, L. Pellegrino, M.A. Preger, L. Quintieri, R. Ricci, U. Rotundo, C. Sanelli, M. Serio, F. Sgamma, B. Spataro, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Vescovi, M. Zobov
INFN/LNF, Frascati (Roma)
- G. Benedetti
CELLS, Bellaterra (Cerdanyola del Vallès)
- L. Falbo
INFN-Pisa, Pisa
- J.D. Fox, P. Raimondi, D. Teytelman
SLAC, Menlo Park, California
- E. Levichev, S.A. Nikitin, P.A. Piminov, D.N. Shatilov
BINP SB RAS, Novosibirsk
|
|
|
- R. Corsini, S. Doebert, F. Tecker, P. Urschütz
CERN, Geneva
- D. Alesini, C. Biscari, B. Buonomo, A. Ghigo, F. Marcellini, B. Preger, M. Serio, A. Stella
INFN/LNF, Frascati (Roma)
|
|
|
The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme by 2010. In particular, one of the main goals is to study the generation of high-current electron pulses by interleaving bunch trains in delay lines and rings using transverse RF deflectors. This will be done in the 42 m long delay loop, built under the responsibility of INFN/LNF, and in the 84 m long combiner ring that will be installed in 2006. The delay loop installation was completed, and its commissioning started at the end of 2005. In this paper the commissioning results are presented, including the first tests of beam recombination.
|
|