JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for WEBO04: Commissioning of the Sumitomo Superconducting AVF Cyclotron SC230

@inproceedings{ebara:cyclotrons2022-webo04,
  author       = {Y. Ebara and Y. Kumata and T. Miyashita and Nakajima, S. Nakajima and T. Tsurudome and H. Tsutsui and J. Yoshida},
% author       = {Y. Ebara and Y. Kumata and T. Miyashita and Nakajima, S. Nakajima and T. Tsurudome and H. Tsutsui and others},
% author       = {Y. Ebara and others},
  title        = {{Commissioning of the Sumitomo Superconducting AVF Cyclotron SC230}},
% booktitle    = {Proc. CYCLOTRONS'22},
  booktitle    = {Proc. 23rd Int. Conf. Cyclotrons Appl. (CYCLOTRONS'22)},
  pages        = {187--190},
  paper        = {WEBO04},
  language     = {english},
  keywords     = {cyclotron, extraction, proton, MMI, operation},
  venue        = {Beijing, China},
  series       = {International Conference on Cyclotrons and their Applications},
  number       = {23},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {10},
  year         = {2023},
  issn         = {2673-5482},
  isbn         = {978-3-95450-212-7},
  doi          = {10.18429/JACoW-CYCLOTRONS2022-WEBO04},
  url          = {https://jacow.org/cyclotrons2022/papers/webo04.pdf},
  abstract     = {{A 230 MeV superconducting AVF cyclotron SC230 is developed by Sumitomo Heavy Industries, Ltd. This is the world’s smallest isochronous cyclotron for proton therapy, and its weight is 65 tons, which is 0.3 times that of our previous cyclotron model. The size is reduced by generating high magnetic fields using NbTi supercon-ducting coils cooled without cryogen. In addition, this cyclotron features the maximum beam current >1 uA and low power consumption <200 kW. The beam-commissioning test started at the end of 2020, the first extracted beam was observed in July 2021, and the basic performance of the beam was measured. The processes and results of the beam commissioning are reported.}},
}