Author: Yin, Z.G.
Paper Title Page
TUP15 Control System Dedicated for Beam Line of Proton Radiography on 100 MeV Cyclotron CYCIAE-100 202
 
  • Y.W. Zhang, H.R. Cai, L.C. Cao, T. Ge, S.M. Wei, J.J. Yang, Z.G. Yin, T.J. Zhang
    CIAE, Beijing, People's Republic of China
 
  After the first beam on July 4 2014, CYCIAE-100's performance have been improved gradually and is ready for routine operation. There are 7 beam lines in total in the design stage, i.e. N1:ISOL, N2:isotope production, N3:beam dump, S1: single energy neutron, S2:white light neutron source, S3: radiobiological effect, S4:single event effect. The beam lines N2 and N3 were combined into one line during the construction. In the last two years, we propose to build to two new lines, one for principle verification of Proton Radiography, the other one for demonstration of proton therapy. Both of them are quite special. In this paper, a control system for the operation of the beam line of proton radiography, including the magnets, vacuum and water cooling, the beam intensity & profile diagnostics, and the imaging etc, will be presented.  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)