TUP14 The Assembly and Adjustment of the Second Stripping Probe System for CYCIAE-100 199
 
  • Shizhong. An, L.C. Cao, X.L. Fu, Z.G. Li, G.S. Liu, Y.L. Lv, G.F. Pan, Y. Wang, L.P. Wen, J.S. Xing, T.J. Zhang, Y.W. Zhang
    CIAE, Beijing, People's Republic of China
 
  A 100 MeV H compact cyclotron is under construction at China Institute of Atomic Energy (CYCIAE-100). The proton beams ranging from 75 MeV - 100 MeV with 200 μA beam intensity will be extracted in dual opposite direction by charge exchange stripping devices. The stripping probe system is the key part of extraction system for CYCIAE-100. The first stripping extraction system was installed in 2014 and it has satisfied all kinds of requirements for the proton beam extraction. The first 100 MeV proton beam was got on July 4, 2014 and the beam current was stably maintained at above 25 μA for about 9 hours on July 25, 2014. The first RIB with ISOL system driven by 100 MeV proton beam was generated in 2015. The second stripping system was installed in 2015 after the assembly and adjustment. The beam commissioning based on the second stripping system will be finished and the extracted proton beam parameters will be measured in detail in this year.  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)