THM13 Commissioning of the Low Energy Storage Ring Facility CRYRING@ESR 81
 
  • F. Herfurth, Z. Andelkovic, M. Bai, A. Bräuning-Demian, V. Chetvertkova, O. Geithner, W. Geithner, O.E. Gorda, M. Lestinsky, S.A. Litvinov, G. Vorobjev, U. Weinrich
    GSI, Darmstadt, Germany
  • A. Källberg
    Stockholm University, Stockholm, Sweden
  • T. Stöhlker
    HIJ, Jena, Germany
 
  CRYRING@ESR is the early installation of the low-energy storage ring LSR, a Swedish in kind contribution to FAIR, which was proposed as the central decelerator ring for antiprotons at the FLAIR facility. An early installation opens the opportunity to explore part of the low energy atomic physics with heavy, highly charged ions as proposed by the SPARC collaboration but also experiments of nuclear physics background much sooner than foreseen in the FAIR general schedule. Furthermore, the ring follows in large parts FAIR standards, and is used to test the FAIR control system. CRYRING@ESR has been installed behind the existing experimental storage ring ESR starting in 2013. It has a local injector that is used for commissioning. In November 2016 the commissioning of the storage ring started and a first turn was achieved. After a complete bake out cycle and substantial developments of control system, diagnosis and others, commissioning was continued in late summer 2017. Stored as well as accelerated beam has been achieved by now. The remaining step is to take the electron cooler into operation, which is planned for November this year.  
slides icon Slides THM13 [4.318 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-COOL2017-THM13  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)