Author: Qiu, F.
Paper Title Page
TUPB021 Measurement of the Cavity Performances of Compact ERL Main Linac Cryomodule During Beam Operation 592
 
  • H. Sakai, M. Egi, K. Enami, T. Furuya, S. Michizono, T. Miura, F. Qiu, K. Shinoe, K. Umemori
    KEK, Ibaraki, Japan
  • M. Sawamura
    JAEA, Ibaraki-ken, Japan
 
  We developed ERL main linac cryomodule for Compact ERL (cERL) in KEK. The module consists of two 9-cell 1.3 GHz superconducting cavities, two 20 kW high power coupler, two mechanical tuner and three HOM dampers. After construction of cERL recirculation loop, beam operation was started in 2013 Dec. First electron beam of 20 MeV successfully passed the main linac cavities. After adjusting beam optics, energy recovery operation was achieved. Main linac cavity was enough stable for ERL beam operation with digital LLRF system and energy recovery was successfully done with CW 80 uA beam. However, field emission was a problem for long term operation. In this paper, we express the measurement of the cavity performances of long term beam operation.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)